Capital Plan Mapping
Capital Plan Mapping
The 10-year capital plan for infrastructure projects is available as a map (see below). The Town operates and maintains approximately $350 million worth of assets which require continual rehabilitation and replacement. This clear long-term plan will ensure the efficient use of available budgets and maximize asset lifecycles. All streets will be constructed using a “complete streets” approach to create attractive and livable streets. The goal of complete streets is to provide a safe, healthy, and vibrant community by including active transportation options and greenspace into designs.
Complete Steets Example
The plan was developed using in-house expertise, condition assessment data, and various studies. Projects are prioritised based on a number of factors including risk, most effective timing of rehabilitation to maximize lifecycle, areas with combined sewers, pipe upsizing for upstream development, age and condition of infrastructure, etc. Selecting the projects is complicated by the fact that there are multiple assets (i.e. sewers, watermain, road, sidewalk, etc.) within the same road allowance that all have varying life expectancies and rehabilitation or replacement needs.
Contact Town of Aylmer Staff
Director of Infrastructure
519-773-3164 ext. 4927
Email