The Town of Aylmer will continue road maintenance works on Progress Drive, between John St North and the east corner of Progress Drive. Paving is expected to occur on Saturday, May 10, 2025, between 1:00 & 7:00 PM. Read on for further details.

Area of Work

Details

Location: Progress Drive – John St North to the East Corner of Progress Drive

Work Date: May 10, 2025

Scope: Tack coat and paving of the asphalt road surface.

Traffic: Traffic will be reduced at times. A minimum of one lane of flagged traffic will be provided at all times. Police will be present in the lighted intersection of John St. and Progress Dr. There will be select periods of time where driveway access may be restricted when the paving operation is adjacent to a driveway.

Asphalt “Tack Coat”: Tack coat is a thin coat of liquid asphalt that is applied (sprayed) between the new hot mix asphalt and the existing milled surface of the road to promote bonding. The tack coat is sprayed in front of the paving operation. If driven over, the tack coat can leave a black residue on vehicle tires/sidewalls and driveway surfaces. Please avoid driving on freshly applied tack coat and into private driveways.

Vibration: Construction equipment can cause vibrations. Please ensure you protect any valuables susceptible to damage.

Safety: Stay safe and avoid the work area during construction. Maintain a safe distance from construction vehicles entering and leaving the site.

If you have any questions about this project, please contact the Town of Aylmer’s project manager/ inspector for this project below:

Terry Koning, C.E.T.

519-773-3164 ext. 4927

[email protected]