The Building and Planning Departments of the Town of Aylmer have collaborated to prepare a report for Council that provides a development activity update for 2024. The report was presented at the August 14, 2024 Regular Meeting of Council.

Summary of Building Department Activity

  • 28 permits issued (Jan 1 2024- July 1 2024)
  • 4 single-family dwellings – Cottonwood
  • Willow Run subdivision has been serviced and is nearly ready for the issuance of building permits
  • Most permits issued for residential additions and alteration permits for decks, sheds, home renovations
Cottonwood
Willow Run
Willow Run Trail

Summary of Planning and Development Department Activity

  • Cottonwood Subdivision
    – Phase 2 construction of residential lots
    – Site entrance and SWM pond have been naturalized
    – Phase 3 – engineering design and review phase for the extension of Cottonwood Boulevard and Aspen Parkway
  • Willow Run Subdivision and Condominium
    – Fully serviced including watermain, SWM pond, storm sewers, sanitary sewers, sanitary pump station, utilities, and rough road construction
    – 1km of new multi-use pathways from Rotary Park to the new SWM facility
    – 55 single detached residential lots
    – 8 semi-detached lots
    – 13 townhouse residential lots
    – 44-unit vacant land condominium community
    – 9.87ha of dedicated parkland
  • AIM Park – Industrial Development/Employment Lands
    – 14 lot/blocks of varying sizes full serviced for industrial development
    – Extension of White Street and south access off Elm Street through new road “Aim Park Way”
    – Fully serviced including watermain, SWM pond, storm sewers, sanitary sewers, and over 1km of new road construction
  • 335 John Street South
    – 34-unit townhouse condominium site
    – Condo site have been constructed and serviced
  • 431 John Street South
    – 76 unit townhouse development with private road network
    – Engineering design and review complete
  • 249 John Street South
    – 13-unit townhouse development with private road and parking
    – Engineering design and review complete
    – Construction will commence in August 2024
  • 45 Progress Drive (Home Hardware)
    – Construction is nearly complete
    – Additional parking and relocation of lumber yard to this location
  • 25 Progress Drive (Restaurant Site)
    – Proposed drive thru restaurant and a restaurant
    – Servicing for Phase 2 was partially completed through the Phase 1 construction
  • Zoning By-Law Amendments
    – 52 Warren Street
    – 154 Talbot Street West – refused
    – 81 South Street West – refused
    – 345 Talbot Street West
    – 78 Spruce Street West
  • Minor Variances
    – 87 Victoria Street South
    – 183 Elk Street
    – 431 John Street South
    – 110 Talbot Street West
    – 66 Tarry Parkway – refused
  • Severances
    – 36 Victoria Street North
    – 25 & 27 Parkview Heights
    – 11 Linden Street
  • Pre-consultations
    – John Street North – four different properties, proposal industrial, commercial and residential development
    – South Street West – institutional expansion
    – AIM Park – proposed industrial development
  • Planning Policy Review
    Bill 185, Cutting Red Tape to Build More Homes Act
    Adopted County of Elgin Official Plan
    Proposed Provincial Policy Statement, 2024
AIM Park
45 Progress Drive
25 Progress Drive

Summary of Engineering Activities

Contact Town of Aylmer Staff

Director of Infrastructure
519-773-3164 ext. 4927
Email

Manager of Planning and Development
519-773-3164 ext. 4915
Email

Chief Building Official
519-773-3164 ext. 4902
Email

2022 Municipal Election By-Laws Bidding Opportunities Aylmer Attractions Business Directory