Elk Street Reconstruction Update: April 11, 2025
Elk Street Reconstruction Update: April 11, 2025
Location: Elk Street
Initial road removals have been completed and temporary watermain has been installed for Phase 1. These are the last items to be completed before underground servicing work (i.e. sewers and watermain) may begin. The contractor is PV-EX Construction Ltd.
Work Completed to Date:
- Layout and commissioning of temporary watermain.
- Removal of asphalt road surface and curb and gutter.
Work Scheduled for Next Week:
- Sanitary sewer installation and road excavation commencing on east leg (near Talbot Street).
Road Closures and Access:
- Elk Street will be closed to through traffic during construction, but open to local traffic.
- Local residents should access Elk Street from west end, Victoria Street or John Street.
- Driveway access may be interrupted periodically during construction. Notification will be provided in advance of a driveway access disruption.
Construction Safety:
- Please respect the work zone.
- Use caution when using the street or sidewalks near construction limits.
- Maintain a safe distance from any moving equipment, stockpiles or trenches.
Further construction updates will be provided to residents as the project progresses. Detailed information about the project is also available on the Town project specific website at: www.aylmer.ca/elk-street-reconstruction
The Town thanks residents for their patience and cooperation during this project.