The Town of Aylmer is currently completing the preliminary design for South Street East from Queen Street South to Victoria Street South. The project also includes one block of Victoria Street South from South Street East to Elk Street.

A PUBLIC INFORMATION CENTRE will be held on THURSDAY, 14 AUGUST 2025 from 6:00 PM. to 8:00 PM at the Town Hall Council Chambers, 25 Centre Street, Aylmer, Ontario. The open house will allow for residents to review the preliminary design, discuss the project, allow for any input from the public, and to address any items of concern.

PROJECT & CONSTRUCTION LIMITS

SCOPE OF WORK

The scope of underground work generally includes replacement of the existing watermain, sanitary sewer, and storm sewer systems including mainline and residential services. Barrier curb and gutter will be replaced throughout, and existing sidewalks will be removed and replaced with 1.5m wide sidewalks. Existing trees that have become unsafe or are in conflict with proposed the proposed works will be removed and replaced with new 100mmø trees behind the property line. Driveways will be restored to match existing surfaces, and disturbed grassed areas will be restored with topsoil and sod.

Road closures will be permitted throughout construction. Access to local residences will be maintained except for short periods when trenches or new concrete work may block entrances.

PROJECT SCHEDULE

Once the final design has been completed, the Town will evaluate the project for inclusion into the 2026 capital budget.

QUESTIONS/ QUERIES

Information may be obtained from project staff as noted below:  

Adrian Aslani

Project Technologist

Town of Aylmer

Ph: 5519-773-3164 ext. 4916